Glossary
GFC drawings (good for construction)
GFC drawings are the final, approved drawings that site is allowed to build from. Anything earlier is a draft.
In practice
Most site rework traces back to someone building from a drawing that was not yet GFC, or from an older revision. Issuing a clear GFC set, and marking older versions as superseded, prevents it.
In Pakka
Production stays shut until the design manager and the client approve the GFC set. Every revision carries a note on what changed, site gets that note, and old versions are kept and marked superseded.
Related terms.
- Recce (site measurement)A recce is the first site visit to measure the space and record its existing conditions before design starts.Read more
- Client selectionA client selection is a decision the client must make between options, such as one of three laminates or tiles, before that work can proceed.Read more
Give us your messiest project. The first one is free.
Ten founding firms get their first project on Pakka free, set up with them over WhatsApp in an afternoon. Everyone else joins the waitlist, and we open in batches.
10 of 10 founding spots left
How the founding programme works · Questions? WhatsApp us
Already on Pakka? Log in