What it really takes to run an interior firm.
Long reads for owners: the 14-hour quote, the formula that cost lakhs, the bill nobody measured, the client who calls every evening. And what good firms do about it.
Quoting
- The 14-hour quoteAdd up the hours behind one residential quote and the number is usually ugly. Most of it is not estimating at all. Here is where the time goes and how firms win it back.8 min read
- One wrong cellA SUM range that stops one row short. A GST rate typed into a formula. A rate copied from last year. Spreadsheets fail quietly, and on an interior project the bill arrives months later.9 min read
- Starting from scratch, againMost of every quote is the same kitchen, the same wardrobes and the same payment plan in a new size. Yet many firms rebuild it all, every time, and lose it all when one estimator leaves.8 min read
- Your quote just got forwardedYou spent fourteen hours on that quote. On WhatsApp, it takes one tap to send it to the next firm, the client's cousin or a local contractor who will 'do the same at less'.8 min read
Site
- “Done, sir”: why done on site rarely means doneThe two most expensive words on an interior site are said politely, every evening, by people who mean well. Here is the gap between reported, checked and payable, and how good firms close it.8 min read
- 214 unread messages: how WhatsApp groups lose your site decisionsThe tile shortage was reported at 11 in the morning. The PM found it at 6 in the evening. Nobody did anything wrong, and that is exactly the problem.8 min read
- The ceiling that came down twice: the true cost of reworkRework is rarely one big disaster. It is a false ceiling closed over an untested line, opened, closed and opened again. Here is what that really costs, and the sequencing that prevents it.9 min read
- Why your site team won’t use another app (and shouldn’t have to)You bought the software, ran the training and made the rule. Three weeks later the site team is back on WhatsApp. They are not being difficult. The app was built for someone else’s day.8 min read
- The drawing on site is not the drawing you approvedThe client asked for sliding shutters. The design team changed the drawing. The carpenter built hinged ones, from a perfectly good drawing that had been replaced two weeks earlier.8 min read
Money
- The final bill warThe carpenter says 1,840 square feet. The PM says 1,610. Nobody measured it together at the time, so now it is one person's word against another's, and the firm pays for the gap either way.8 min read
- Your margin leaks in the variations nobody billedNobody steals margin from an interior project. It walks out quietly, one small yes on a site visit at a time.8 min read
- Can we cover Friday?Profitable firms run out of cash all the time. The fix is not a better accountant. It is looking eight weeks ahead, every week, at money in next to money out.9 min read
- Paid on someone's wordFraud is rare in small firms. Mistakes are not. The person who raises a payment should never be the only person who approves it.8 min read
- Retention released too earlyRetention is the only leverage you have once the work is done. Release it on goodwill, and the snag list becomes your problem.8 min read
- The instalment that drifted three weeks'Pay when carpentry is complete' sounds clear until someone has to decide what complete means. Then the instalment drifts, and the firm funds the gap.8 min read
Clients
- “It was already like that”: settling handover disputes before they startA crack in the balcony tile, a chip in the main door, a stain on the bathroom ceiling. Was it there before you started? Without day-zero photos, the answer is whatever the client remembers.8 min read
- Silence is bad newsYour clients are not checking up on you because they distrust you. They are filling a silence. Here is what that silence costs, and how to end it before the phone rings.8 min read
- What homeowners actually want from their interior firmClients choose you for the portfolio. They remember you for how the months in between felt. Here is what homeowners are really buying, and how to give it to them.8 min read
- Handover day, done properlyMonths of good work can be undone in an hour at handover. Here is what a proper handover includes, a two-week plan to get there, and why it is the most important week of the project.8 min read
Growing a firm
- The 48-hour ruleMost families talk to more than one firm. The one that answers first, and keeps answering, starts with an advantage that a better portfolio often cannot undo.8 min read
- The owner is the integrationMost interior firms do have systems: a quote sheet, a drawing folder, a site group, an accountant. What they lack is the link between them, and that link is usually one tired person.8 min read
- From 3 projects to 15: what breaks firstGrowth does not break an interior firm all at once. It breaks one thing, then the next, in a fairly predictable order. Here is that order, and what to fix at each stage.9 min read
Give us your messiest project. The first one is free.
Ten founding firms get their first project on Pakka free, set up with them over WhatsApp in an afternoon. Everyone else joins the waitlist, and we open in batches.
10 of 10 founding spots left
How the founding programme works · Questions? WhatsApp us
Already on Pakka? Log in