Founding firms: your first project on Pakka is free.First project free. 10 of 10 spots left Apply

Quoting · 8 min read

Starting from scratch, again

Most of every quote is the same kitchen, the same wardrobes and the same payment plan in a new size. Yet many firms rebuild it all, every time, and lose it all when one estimator leaves.

Ravi gave his notice on a Monday. He had been the estimator at Sunil's Bangalore firm for six years, and he was leaving for a bigger company in Hyderabad. He was polite about it, offered to stay two weeks, and spent those two weeks finishing a Whitefield 3BHK and a villa in Sarjapur.

On his last Friday, Sunil sat down with Ravi's laptop to understand what he was inheriting. There was a folder called Quotes. Inside it were 214 Excel files, with names like Final, Final_v2, Final_revised_NEW and Final_revised_NEW_use_this. There was a rate sheet, last modified eight months ago. There were three versions of a kitchen costing, each slightly different, and no note on which one Ravi actually used.

Sunil asked Ravi how he priced a fluted wardrobe shutter. Ravi explained it in four minutes: the base rate, the add for the profile, the labour bump for the extra finishing, the hardware that changes. It was clear, sensible and entirely in his head. None of it was in the folder.

That evening, Sunil realised the firm had not lost an employee. It had lost six years of its own memory.

The quote you have already written a hundred times

Lay your last ten residential quotes side by side and something becomes obvious. Most of the lines are the same items. A modular kitchen with base and wall units. Wardrobes in two or three finishes. A TV unit. False ceiling in the living room. Painting, electrical points, a few lights. The sizes change, the finishes change, the client's name changes.

The same is true after the quote. The payment plan follows the same stages on most projects. The carpentry vendor's scope says roughly the same thing every time. The buying list for a 3BHK looks a lot like the buying list for the last 3BHK.

Yet in many firms, every one of these documents is rebuilt from scratch on every project. The quote is typed again. The BOQ is re-typed into a buying list. The payment plan is re-typed into an invoice schedule. The vendor scope is re-typed from the BOQ. The same knowledge is entered four times, by four people, with four chances to get it wrong.

Rebuilding the same documents every project
Quote and BOQ built from a blank or old sheet6 hours
BOQ re-typed into buying lists3 hours
Payment plan rebuilt for invoicing1 hour
Vendor scopes written from the BOQ4 hours
Hours per project14 hours
Projects per year30
Hours a year re-entering what the firm already knows420 hours

Illustrative figures for a firm running thirty projects a year. Use your own numbers.

Four hundred and twenty hours is more than fifty working days. And that is before counting the errors that creep in every time something is copied by hand.

Why templates are not enough

The usual fix is a template. Take a good past quote, clear out the client's name, save it as Template_3BHK, and start every new quote from it. It is better than a blank sheet. It is also how a lot of quiet errors begin.

  • A template carries old rates. The plywood price in it is whatever it was the day the template was saved.
  • A template carries old specifics. The previous client's pooja unit, a brand they insisted on, a line nobody remembers to delete. Every owner has a story about a quote that went out with someone else's name on page three.
  • A template forks. Within a year there are five versions, each designer has a favourite, and nobody knows which one has the current kitchen costing.
  • A template only helps the quote. The BOQ, the payment plan and the vendor scope are still rebuilt by hand downstream.
A template copies a document. A rate library keeps the knowledge behind it.

Rate library, recipes and bundles

The firms that have solved this think in three layers, and the layers are worth understanding even if you only ever use a spreadsheet.

  1. A rate library. One list of everything you sell, with a clear name, a unit and a current rate. Not a quote, just the items. 'Wardrobe shutter, PU, per sq ft.' 'False ceiling, gypsum, per sq ft.' Each rate has an owner and a date.
  2. Recipes. How a finished item is built from library lines. A wardrobe recipe is carcass plus shutters plus hardware plus labour. Ravi's four-minute explanation of the fluted shutter is a recipe. Written down, it survives his resignation.
  3. Bundles. Groups of recipes you sell together. A standard kitchen package. A two-bedroom wardrobe set. A rental-ready package for an investor flat. A bundle turns a common request into one decision.

With these three layers, a new quote is mostly choosing: which bundles, which recipes, which sizes and finishes. The rates come along on their own, and they are current because they live in one place.

The library also changes what happens when someone leaves. Ravi's knowledge is no longer in Ravi. It is in the recipes, where the next estimator can read it, question it and improve it.

The memory a firm forgets it has

Every interior firm that has been around for a few years knows things that are written down nowhere. That a certain laminate chips at the edges unless it is banded a particular way. That the false ceiling rate needs a bump in older buildings with uneven slabs. That a particular society in Bellandur only allows work until six, so labour days run longer. That one client segment always asks for a pooja unit late, so it is worth quoting as an option upfront.

Each of these rules was learned the expensive way, usually on one project that went wrong. In a firm that rebuilds its quotes from scratch, the rules survive only as long as the person who learned them stays. When they leave, the firm pays to learn the lesson again.

This is the real cost of starting from scratch. It is not just the hours of typing. It is that a firm with ten years of experience can end up quoting like a firm with two, because its experience never made it out of people's heads and into the way it prices work.

A new estimator joining a firm with a good library learns the firm's way of pricing in weeks. A new estimator joining a firm with 214 files called Final spends months guessing, and the firm's margins quietly pay for the guesses.

How to start, this month

You do not need a big project to begin. You need a few evenings and one person who owns it.

  • Pull your last ten won quotes. Won ones, because those rates survived negotiation.
  • List every distinct item that appears in at least three of them. That is your first library.
  • Agree one name and one unit for each item. 'Wardrobe shutter, PU, per sq ft' is the name everywhere, not five different spellings.
  • Write recipes for your five most common items, starting with kitchens and wardrobes.
  • Put a date and an owner on every rate, and review the library every quarter, or whenever a major supplier changes prices.
  • Write a standard payment plan for each project type, and a standard scope for each trade's vendor.
  • When anyone leaves, ask for one last job: write down the recipes and rules they carry in their head.

This is slow work for a month and then it pays back on every project after. The first quote built from a real library usually feels strange, because it is so much shorter to make.

How Pakka handles it

Pakka's Sales Desk keeps a rate library with finishes, recipes and bundles, so your team never types a rate you already have. You can import your existing rates, and import a client's BOQ from Excel or PDF, so the knowledge already in your files is not lost.

The quote is the start, not the end. When the client says yes, one click creates the project with its rooms and BOQ already in place. Approved quote lines become the project budget, the quote's payment plan becomes the client's payment schedule, and the rooms and BOQ lines become the phases, tasks and buying lists on site.

What the firm knows stays with the firm, in a place everyone can see. When the next Ravi moves on, the next estimator starts with six years of recipes instead of 214 files called Final.

Give us your messiest project. The first one is free.

Ten founding firms get their first project on Pakka free, set up with them over WhatsApp in an afternoon. Everyone else joins the waitlist, and we open in batches.

10 of 10 founding spots left

How the founding programme works · Questions? WhatsApp us