Founding firms: your first project on Pakka is free.First project free. 10 of 10 spots left Apply

Roundup

9 best project management software for interior designers (2026)

The short answer

  • Built for Indian interior firms: Pakka (site on WhatsApp, money on proof), Project Studio (broad suite with labour and inventory), Potlu (low-cost all-in-one).
  • Construction tools many interior firms use: Onsite and Powerplay for crews and materials, RDash for large fit-out with procurement teams.
  • Global and general: Houzz Pro and Buildertrend for US-style residential work, Zoho Projects for cheap general task tracking.
  • Choose by where projects slip: site updates, approvals, or payments.

We make Pakka, and it is on this list. We say where other tools are better, and every fact about them comes from their own websites. Prices change, so we describe pricing models, not figures.

What this software does

Project management software for interior designers tracks a project from a won quote to handover: design phases and approvals, site tasks and progress, quality checks and snags, vendors and payments, and updates to the client. General tools track tasks; interior tools also connect the BOQ, drawings and money. Disclosure: Pakka publishes this page and makes one of the tools listed.

How we evaluated

  • Built for interiors. Rooms, BOQ lines, drawings and GFC, rather than generic tasks.
  • Site reporting. How engineers report progress, and whether they need a new app.
  • Approvals and quality. Client approvals, QC checks and snags before handover.
  • Money tied to work. Whether payments connect to progress, and who approves them.
  • Fit for a 5 to 50 person firm. Setup effort, implementation fees and plan sizing.
  • Pricing model. Free plan, per user, one plan, or quote-based. Figures change, so we give the model.

Built for Indian interior firms

Products designed around interior studios and design-build firms in India.

  1. Pakka (that's us)

    pakka.work

    Best for: Firms whose site teams live on WhatsApp and whose leaks are payments, vendor bills and rework.

    Pakka (which we make) is a platform of four desks: Sales, Design, Money and Ops. Site engineers report by voice note, photo or one tap on WhatsApp with nothing to install, and the office sees tasks, QC and snags update live. A firm can start with any one desk and add the others later.

    Strengths

    • Site work runs inside WhatsApp: voice notes become tasks, issues and approvals with an owner.
    • Quotes drafted from the client's brief and floor plan using your own rate library; the AI never writes a price.
    • Money moves on proof: a QC pass or GFC issue releases a stage, and whoever raises a payment cannot approve it.
    • Drawing revisions carry a change note to site, and nothing goes to production before the GFC set is approved.

    Limits

    • No labour attendance, payroll, inventory or warehouse management.
    • Fewer integrations than established tools, and no 3D design or rendering: you keep your design software.
    • New to the market, and prices are not published yet.

    Pricing: Founding firms: first project free. Per firm and per desk, no seat fees for site teams; prices announced before the waitlist opens.

    India fit: Built for Indian firms: site work on WhatsApp, GST in proposals, TDS on receipts, MSME pay-by countdown, and phase lengths from Indian output norms.

  2. Project Studio

    Website

    Best for: Studios that want one broad suite, including labour, payroll and inventory.

    Project Studio describes itself as AI-native software to manage interior projects from design to delivery, for studios, design-build teams, contractors and manufacturers. Its plans cover CRM, quotes, POs, finances, inventory and warehouse, attendance with geolocation, HRMS, snags and client progress.

    Strengths

    • Very wide module list, including attendance, timesheets, HRMS and warehouse.
    • AI agents, BOMs from drawings and auto-rendered designs.
    • Mobile apps for iOS and Android; WhatsApp integration on higher plans.

    Limits

    • Site teams work in its app rather than inside WhatsApp.
    • No free trial stated; demo first.

    Pricing: Annual plans by team size (Growth, Pro, Enterprise), plus taxes; optional implementation support.

    India fit: Serves India, the Middle East and the US; WhatsApp integration on Pro and Enterprise. GST and language support Not stated.

  3. Potlu

    Website

    Best for: Studios that want projects, purchasing and accounts in one low-cost plan, with light site needs.

    Potlu, by Atluz, is business software for Indian interior designers, from first enquiry to handover and final payment. It covers enquiries, BOQs, quotations, planning, tasks, budgets, mood boards, purchasing, teams and accounts, with an AI assistant called Sia.

    Strengths

    • One plan with every feature, for up to 15 users.
    • Free initial setup and data migration.
    • Accounting reports, payroll and HR alongside projects.

    Limits

    • Site work happens in its web app; WhatsApp workflows are not described on its site.
    • No published customer proof on its homepage.

    Pricing: One annual plan with every feature, up to 15 users, plus GST; AI credits included on first purchase.

    India fit: Built for Indian interior designers; priced in INR plus GST.

Construction tools used by interior firms

Construction-first products. Strong on labour, materials and procurement, lighter on design approvals and client experience.

  1. Onsite

    Website

    Best for: Contractors and design-build firms that want site, labour and materials in one low-cost ERP.

    Onsite is construction project management software that names design-build and interior firms among its segments. It covers BOQ and RA bills, leads and quotations, labour attendance and salary, material requests, inventory, purchase orders, payments and design management.

    Strengths

    • Labour attendance with GPS and facial recognition, and salary.
    • Materials, central warehouse, RFQs and purchase orders.
    • Multi-language support and Tally and Zoho integration.

    Limits

    • Construction-first language and workflows.
    • Site teams use the Onsite app, not WhatsApp itself.

    Pricing: Per user per year, billed annually with a minimum number of users, plus GST; Enterprise is quote-based.

    India fit: Priced in INR plus GST; multi-language; Tally and Zoho integration.

  2. Powerplay

    Website

    Best for: Construction teams with large labour crews and heavy material movement.

    Powerplay is construction management software with a mobile app and desktop software for owners, project managers and site engineers. It covers project progress and daily reports, materials and POs, labour attendance and payroll, issues, reports and petty cash.

    Strengths

    • Labour attendance and payroll.
    • Material management, POs and petty cash.
    • A long track record in Indian construction.

    Limits

    • Not interior-specific: no client briefs, design approvals or GFC flow described.
    • Positioned as an app that replaces WhatsApp, so site teams need its app.

    Pricing: Not published on its site; demo on request.

    India fit: Built for the Indian construction industry.

  3. RDash

    Website

    Best for: Larger commercial fit-out and design-build contractors with procurement teams.

    RDash is AI-powered construction management software that unifies site teams, procurement, design and finance. Its plans cover BOQ and change orders, purchase requests, vendor orders and invoices, materials, DPRs, snags and QC, and client billing.

    Strengths

    • Deep procurement and materials management.
    • Integrations with Tally, Zoho, Odoo, SAP, Oracle and more.
    • DPRs, task reminders and approvals sent to WhatsApp, with a 90-day deployment guarantee.

    Limits

    • Plans are sized for firms running large annual project volumes.
    • Implementation and onboarding are priced separately.

    Pricing: Per user per year, paid annually in advance (Pro); Enterprise quoted by users and volume; implementation extra.

    India fit: Gurugram-based; Tally and Zoho integration; WhatsApp notifications.

Global and general tools

Mature products built for other markets or for any kind of project.

  1. Houzz Pro

    Website

    Best for: Design and remodelling firms in markets where the Houzz marketplace brings leads.

    Houzz Pro is business software for home design and remodelling professionals: estimates, takeoffs, proposals, invoices, a client dashboard, 3D floor plans, schedules, daily logs and Houzz AI, plus lead generation from the Houzz marketplace.

    Strengths

    • A free plan and a 30-day free trial.
    • Estimates, proposals and invoices with AI help.
    • Client dashboard and 3D floor plans in the same product.

    Limits

    • Priced in USD and built around the US market.
    • No WhatsApp-based site workflow.

    Pricing: Free plan and 30-day free trial; paid plans (Design, Pro, Teams) shown per month on an annual subscription.

    India fit: Prices in USD; GST and India support Not stated.

  2. Buildertrend

    Website

    Best for: Home builders and remodelers in the US and similar markets.

    Buildertrend is construction management software for home builders, remodelers and contractors. It covers scheduling, estimates, proposals, budgets, change orders, selections, a client portal, online payments, daily logs and purchase orders.

    Strengths

    • Very broad feature set, with unlimited users and projects.
    • Mature client portal, selections and change orders.

    Limits

    • Priced in USD; India is not among the countries named on its pricing form.
    • Built around US residential building, not Indian interiors.

    Pricing: Quote-based by annual construction volume, billed monthly with a discount for paying annually.

    India fit: Not stated; USD pricing.

  3. Zoho Projects

    Website

    Best for: Firms that want a cheap, general task and timeline tool.

    Zoho Projects is general project management software with tasks, dependencies, Gantt charts, timesheets, issue tracking and mobile apps. It is not built for interiors, so BOQs, site QC and vendor bills need other tools.

    Strengths

    • Free plan for up to 5 users.
    • Gantt charts, timesheets and issue tracking.
    • Read-only client users on higher plans.

    Limits

    • No BOQ, quotes, drawings approval or site QC built for interiors.
    • Site teams need its app.

    Pricing: Free plan for up to 5 users; paid plans per user per month, billed annually; 15-day free trial.

    India fit: From Zoho, an Indian company; the pricing page read shows USD.

Side by side.

9 best project management software for interior designers (2026): comparison
ToolBuilt forSite reportingLabour and inventoryPricing model
PakkaIndian interior and design-build firmsInside WhatsAppNot offeredPer firm and per desk
Project StudioInterior studios and design-buildOwn appYesAnnual, by team size
PotluIndian interior designersWeb appPayroll; inventory Not statedOne annual plan
OnsiteConstruction, incl. interiorsOwn appYesPer user per year
PowerplayConstructionOwn appYesNot published
RDashLarge fit-out and design-buildOwn app, reports to WhatsAppMaterials, yesPer user per year, plus implementation
Houzz ProUS design and remodellingDaily logs in appNot statedFree plan, paid monthly
BuildertrendUS builders and remodelersDaily logs in appTime clock; inventory Not statedQuote-based by volume
Zoho ProjectsAny projectOwn appNot offeredFree plan, per user

How to choose.

  • Start from your worst slipIf site updates get lost, prioritise site reporting. If clients delay approvals, prioritise approvals. If payments drift, prioritise money control.
  • Match the tool to your firm's sizeRDash and Buildertrend suit larger firms; Pakka, Potlu and Zygn suit smaller studios.
  • Decide on labour and inventoryIf you run your own crews and stores, Project Studio, Onsite or Powerplay cover them. Pakka does not.
  • Test with your site engineer, not just the officeThe office will use anything. The project only works if the site reports.
  • Count the full costPer user fees, implementation charges and add-ons change the real price.

Questions people ask.

What is the best project management software for interior designers in India?

For WhatsApp-first site teams, Pakka. For a broad suite with labour, payroll and inventory, Project Studio. For a low-cost all-in-one, Potlu. For large fit-out contractors, RDash.

Can I use Zoho Projects or a general tool?

Yes, for tasks and timelines. You will still need separate tools for BOQs, drawing approvals, QC and vendor bills.

Is Houzz Pro available for Indian firms?

Its pricing is in USD and its site does not state India-specific support or GST. It suits firms in markets where the Houzz marketplace brings leads.

Do site engineers need to install an app?

For most tools, yes. Pakka runs site work inside WhatsApp, so there is nothing to install.

Which tools tie payments to progress?

Pakka releases stages on events such as a QC pass, with a second approver. RDash compares installed progress with invoicing, and Onsite raises client invoices from progress.

Does Pakka handle labour or inventory?

No. Pakka does not offer labour attendance, payroll, inventory or warehouse management.

Where do these facts come from?

Each product's own website, read on 21 Oct 2026. Check their sites for the latest.

Sources: projectstudio.ai (home, pricing), read 21 Oct 2026; potlu.com (home, pricing), read 21 Oct 2026; onsiteteams.com (pricing), read 21 Oct 2026; getpowerplay.in (home), read 21 Oct 2026; rdash.ai (home, pricing), read 21 Oct 2026; houzz.com (Houzz Pro pricing), read 21 Oct 2026; buildertrend.com (pricing), read 21 Oct 2026; zoho.com (Zoho Projects pricing), read 21 Oct 2026; Pakka: pakka.work desk pages, Oct 2026.

More roundups

Give us your messiest project. The first one is free.

Ten founding firms get their first project on Pakka free, set up with them over WhatsApp in an afternoon. Everyone else joins the waitlist, and we open in batches.

10 of 10 founding spots left

How the founding programme works · Questions? WhatsApp us